Post Installation Inspection (“PII”) and Post Modification Inspection (“PMI”), play a crucial role in ensuring proper installation in accordance with the design documents, asset data capture, the performance of telecommunications infrastructure, and network integrity. This PAN outlines best practices and how properly conducted PMIs and PIIs directly benefit all stakeholders by improving quality, safety, and efficiency of telecommunications infrastructures.
Codes and Standards Referenced:
- ANSI/TIA-222 Rev. H
- 15.8.4
- 18.0
- Annex N
- Annex O
- IBC
- Chapter 17
Leave A Comment